  • Challenges tackled by the project

    1. Four-stroke methanol engines, and retrofits of marine engines to
    methanol operation, not commercially available
    • i.e. power range 100 kW – 10 MW
    2. No demonstration of the full chain of renewable methanol
    production to ships sailing on it
    3. Production – distribution – bunkering – sailing
    Rules and regulations not mature yet
    4. Need practice, on different vessel types, need to be challenged if required 4y project, started June 1st 2020, 14 partners, 6.4 M€ (5 M€ EU funding)



  • Download presentation
  • Knipsel
        • Presentation date
        • 11/05/2022
        • Speaker
        • Sebastian Verhelst (Associate Professor of Combustion Engines)
        • Company
        • Ghent and Lund University